INTERFACE DEMONSTRATION — SIMULATED DATA (No live connection to an active venue)
Use the project-type selector in the header to switch scenarios.

Orangead Platform • Mission Control Interface

Multi-stage festival — Urban park

Simulation showing 4 monitored zones on Saturday at 9:10 PM (no live connection).

People present (4 zones)

6,140

Instantaneous total — distinct from daily cumulative entries

Stage A Pit density

1.8 p/m²

4,320 people across 2,400 m² usable area

Stage A ref. occupancy

72%

Agreed reference capacity: 6,000 people

Sensor feed status

3 / 4 active

1 zone flagged offline (never shown as zero)

Zone map (people/m² density & reference occupancy)

Labeled sample data
Stage A Pit

4,320 ppl

1.80 p/m² • 2400 m²

Ref. occupancy: 72% (of 6000)

Stage B Zone

1,180 ppl

0.79 p/m² • 1500 m²

Ref. occupancy: 39% (of 3000)

East Gate

640 ppl

0.80 p/m² • 800 m²

Ref. occupancy: 53% (of 1200)

West Footbridge

DATA UNAVAILABLE

Last valid reading: 20:58

Normal (< 65% ref. cap.)Agreed attention threshold reachedInterrupted feed (never shown as 0)

End-to-end operational scenario

Orangead supplies the measurement and its quality state; choosing and executing any field action always rests with the venue operator.

  1. 18:45 PM — Stage A Pit density rises from 1.3 to 1.8 people/m² ahead of the headliner.
  2. 28:52 PM — Agreed operational threshold (70% of reference capacity) is flagged to the Orangead specialist at the security command post.
  3. 38:58 PM — West Footbridge loses network link: UI displays "Data unavailable — last reading 20:58" rather than a false zero.
  4. 49:05 PM — Operations opens the East relief lane; stabilization at 1.75 people/m² is logged for the post-event report.

Event log (simulated)

Stage A Pit21:05

Field action logged: East lane opened by operator

West Footbridge20:58

Feed interrupted — last valid reading preserved (20:58)

Stage A Pit20:52

Configured threshold reached: 1.80 p/m² (72% ref. cap.)

Methodological definitions

Unambiguous metric definitions

Concrete example: 60 people present inside a 100 m² observed usable area equal a physical density of 0.6 people/m². Against an agreed 120-person reference capacity, occupancy is 50%. These two figures are never conflated.

Passages

crossings / period

Observed crossings of a line or perimeter during a defined time window.

Key distinction: A passage is not necessarily a unique visitor (round trips are counted).

People present

people (instant or interval)

Estimated number of people within an observed zone at a given moment or interval.

Key distinction: Instantaneous headcount does not equal cumulative daily attendance.

Physical density

people / m²

People present divided by actually observed usable floor area (e.g., 60 people in 100 m² = 0.6 people/m²).

Key distinction: Physical density is expressed in people/m², never as a standalone percentage.

Occupancy rate

% of reference capacity

People present divided by a reference capacity explicitly agreed with the client (e.g., 60 / 120 = 50%).

Key distinction: Reference capacity is an agreed operational benchmark, not a universal safety threshold.

Directional flow

passages / direction / window

Observed passages moving in a given direction over a defined duration.

Key distinction: Nearby zones are framed separately to prevent double counting.

Zone presence / screen exposure

seconds or minutes (method stated)

Calculated duration within a defined area, or proof of play paired with surrounding zone foot traffic.

Key distinction: Playback, zone presence, aggregated attention and sales are four distinct measurements.

SAMPLE POST-EVENT REPORT (SIMULATED)

Review a complete sample report including Data Quality sign-off

Our 5-page sample report (clearly stamped "Sample — simulated data") shows the exact deliverable structure after an event: scope and zone map, unit definitions, density and passage curves, threshold timeline and a dedicated human Quality Control page (verified sensors, any outages and limits).

Open sample report (PDF)Direct download with no gate • CSV/PDF exports provided upon client request

Inside the 5-page PDF

  • Page 1 — Executive summary, 2-stage sample venue scope and window
  • Page 2 — Metric definitions (passages, people/m², reference occupancy)
  • Page 3 — Per-zone crowd density and observed front-of-stage peaks
  • Page 4 — Operational threshold timeline and logged operator actions
  • Page 5 — Human quality review, network continuity and sightline limits