Measure your event’s critical zones from load-in to final debrief.
Built for festivals, major sporting events, multi-venue games and open sites. Orangead pairs Seetrus sensors, the Mission Control interface and field specialists alongside your ticketing and security teams.
Operations & safety positioning
Orangead is an observation and operational decision-support service. It surfaces density and movement across instrumented zones without replacing command-post judgment or claiming incident prediction or insurance premium reductions.
Answering every stakeholder at the table
Production & operations
Where are concentrations building, how are gates pacing and when does an inter-stage crowd transfer begin?
Security & venue management
What readouts reach the command post and how is a real surge distinguished from a dropped feed?
IT & procurement
What goes onto structures, what power is required and how does data travel?
Four priority zone families
Front-of-stage pits
Measurement: Physical density (people/m²) and occupancy against agreed reference capacity (subject to downstage truss mount and wired LAN).
Informed decision: Inform lateral relief-lane opening, pit entry routing or inter-set coordination.
Entry & exit gates
Measurement: Observed line crossings per time window, including unticketed or free-admission perimeters.
Informed decision: Rebalance welcome crews, screening lanes and directional signage.
Footbridges, corridors & shuttles
Measurement: Passage cadence and approach-zone occupancy during ingress and end-of-night egress.
Informed decision: Meter upstream flow and coordinate relief routing toward secondary paths or shuttles.
Partner & public zones
Measurement: Zone-entry passages and estimated presence duration within the monitored perimeter.
Informed decision: Document factual per-zone attendance in the post-event report shared with stakeholders.
Validated functions & operating conditions
Foot traffic & passage counting
A passage is not a unique visitor. Human quality check prior to report delivery; no derived cameras.
Zone crowd density & occupancy
Recommended mount on downstage truss or high structure (~15 ft), wired LAN (15–30 Mbps/sensor) and an Orangead specialist at the security command post.
Directional flows & zone transfers
Measured per instrumented zone with no individual cross-camera tracking; overlapping sightlines are separated during planning.
Zone presence duration (dwell)
Presence within a zone does not by itself prove queue waiting time; method specified per site geometry.
Operational thresholds & command-post relay
At major events, readings are qualified by an Orangead specialist at the security command post; operational decisions remain with the operator.
Post-event reports & verified exports
Every report undergoes human verification of calculations and sensor continuity prior to client delivery.
What your team receives vs. what the venue provides
Qualify priority questions, candidate zones and genuinely measurable indicators.
Share the site plan, dates, existing structures and operations / IT contacts.
Define Seetrus mount locations, usable areas (m²), reference capacities and per-point prerequisites.
Confirm continuous 120 V power, local network (or VLAN) and rigging access.
Mount and safety-cable sensors (30–60 min/unit), calibrate zones and verify timestamps and feed before doors open.
Provide site access, lift if needed, and sign off on operational benchmarks.
Monitor feeds as contracted, qualify agreed thresholds (with command-post specialist when included) and log any outage.
Maintain agreed power/network and make all on-site operational decisions.
Perform human quality review, document findings, limitations and any missing windows, then present the debrief.
Share operational context so observed curves connect to real field events.